Showing posts with label park. Show all posts
Showing posts with label park. Show all posts

Downtown Olympia Views Studied by City


Above: On one of their frequent walks to the popular Madison Scenic Park, Eastside neighborhood residents Michael McFarlan and Ginger appreciate the view of the Capitol Building, downtown and the territorial Black Hills on Monday morning. This view is one of several priority viewsheds to be analyzed by the City of Olympia as part of a downtown strategy planning effort. 

By Janine Gates

Located at the southernmost tip of Puget Sound, Olympia, Washington has long been described as having the most spectacular views of any state capitol.

From downtown Olympia looking north, one sees Budd Inlet and the Olympic Mountains. To the south, the state Capitol Dome, the fifth-tallest masonry dome in the world and the tallest in North America, rising 287 feet high. To the east, Mt. Rainier. Looking west, the territorial Black Hills.

On March 3, City of Olympia staff briefed councilmembers serving on the city’s Land Use and Environment Committee on the next steps for analyzing several viewsheds within downtown. 

A viewshed is the line of sight between an observation point and a view. The purpose of the city's analysis is to protect or enhance existing views, not to create new viewsheds. 

The recently updated Comprehensive Plan shifted an emphasis from protecting certain views from public streets to protecting and enhancing views from public gathering places. The city says that the observation points to be analyzed must be in public spaces either in downtown or look through downtown to a landmark view. 

An upcoming online city survey will offer the community an opportunity to comment on the viewsheds proposed for analysis. 

The Downtown Strategy’s process builds on past planning efforts during the Comprehensive Plan and Shoreline Master Plan updates. At a November 2015 workshop, participants prioritized certain viewsheds with observation points within downtown that were most important: the Olympic Mountains, the Capitol Dome, Budd Inlet, and Capitol Lake.

With the input of community members and city staff, consultants will analyze up to ten community-valued viewsheds. The analysis will also consider zoning and potential building height increases. Using 3D graphics, modeling will show each view as it exists now, if redeveloped under current zoning, and under any zoning options being explored.

The viewshed analysis will be presented at a June Downtown Strategy workshop and viewshed protection recommendations will be offered to the city council by August.

Above: The viewshed of downtown and the Capitol Building from a pocket park on East Bay Drive as seen on Monday afternoon. If the Port of Olympia parcels are developed as proposed near Chestnut and Olympia Avenue NE, the view of the Capitol Building would likely be obstructed. 

It is unclear from city documents which East Bay viewshed the city is considering analyzing: there is another pocket park further north on East Bay Drive, created in 2004 through a community partnership with the East Bay Drive Neighborhood Association, the Port of Olympia, and the City of Olympia.

Viewshed Priorities

The city has already identified five priority viewsheds for analysis: the Capitol Campus to Budd Inlet with a view across the isthmus, the effect of the 1063 Building on the view of the Capitol Dome, Madison Scenic Park to the Capitol Dome and the Black Hills, the Puget Sound navigation channel view to the Capitol Dome, and the West Bay Park view to Mt. Rainier through downtown.

Five viewsheds under consideration for analysis include Capitol Way and Union Avenue to the Olympic Mountains, Marathon Park to Mt. Rainier, Park of the Seven Oars (near the Harrison Avenue NW and Olympic Way NW roundabout) to Mt. Rainier, Priest Point Park to the Capitol Dome, and the East Bay Waterfront Park to the Capitol Dome.

Above: The 1063 Building is currently under construction on Capitol Way. During the design process, the city made its concerns known to the state about the five story, 215,000 square foot office building. When completed, the building will block the view of the Capitol Building from downtown. Conversely, views of Budd Inlet and the Olympics, as seen here from the Capitol Campus, will soon be obscured. The city does not have zoning authority over the Capitol Campus. Photo taken February 25, 2016.

Several community members attended the March 3 Land Use and Environment committee meeting, commented on the limited scope of the viewshed analysis, and urged the inclusion of other views. 

Krag Unsoeld commented that Mt. Rainier cannot be seen from Marathon Park on Deschutes Parkway, so that particular viewshed should not be listed, and instead be replaced with another viewshed.

Former City of Olympia mayor Bob Jacobs also commented, saying that view protection should involve the whole city, not just downtown.

“The first step in this kind of process should be a community conversation to define what is important to community members about views,” said Jacobs. 

Jacobs is active with Friends of the Waterfront, a local group that has advocated for view protections for several years. That group offered city staff a specific list of comments, questions, and suggested views.

“….We also note the need for clarification of some terms. For instance, what exactly is meant by Capitol Dome? Just the dome? Or does this include the columns beneath the dome? Does it include the Temple of Justice and other buildings? Wilder and White designed the ‘Capitol Group’ to appear as a single structure when viewed from the north. Also, what exactly is the ‘Navigation Channel’ and where is it? Clear definitions will be necessary to the development of clear regulations….” asks Friends of the Waterfront in their letter.

In response to the city’s call for suggested viewsheds for analysis in addition to those already published, the group offered: Capitol Campus to Mt. Rainier, Port Plaza to Capitol Dome, Percival Landing to Capitol Dome, a larger stretch of East Bay Drive to the Capitol Dome (not just the mini-park), Rt. 101 at the Red Lion hotel to Mt. Rainier, Harrison Avenue roundabout to Mt. Rainier (broader than Seven Oars Park), lower roundabout to Mt. Rainier, Deschutes Parkway to Mt. Rainier, Lakeridge Drive to Capitol Dome and Capitol Lake, San Francisco Street to East Bay Drive and Capitol Dome, Eastern Washington Butte at Heritage Park to Mt. Rainier, Port Plaza viewing tower to Mt. Rainier, views of East Bay and West Bay ridgelines, and the Thurston County Courthouse to the Capitol Dome.

Editor's Note/Full Disclosure: Janine Gates also commented at the March 3 meeting. Providing personal pictures as examples, she said the viewshed of landmarks should be expanded to include the experience of coming into downtown and take into consideration the special viewpoints of children and animals who see the city from different perspectives. She also asked that the city conduct a nighttime viewshed analysis to determine the impact of light pollution. Light pollution from the 123 4th Avenue Building and the nine story Capitol Center Building, if it is ever redeveloped, she said, would mar the nighttime beauty of landmarks such as the Capitol Building. With regard to sea-level rise issues, she also suggested an underwater view analysis of downtown.

For more information about the viewshed analysis, go to www.olympiawa.gov or contact Amy Buckler, Senior Planner, City of Olympia, at (360) 570-5847. The city welcomes descriptions and photo(s) of your favorite view(s) which can be emailed to Buckler at DTS@ci.olympia.wa.us.

Above: An unencumbered view of Mt. Rainier from downtown Olympia is one of the most spectacular, cherished sights enjoyed by community members. Photo taken from a West Bay Drive office building parking lot in May 2012.

Downtown Olympia Building Demolition Scheduled


Above: City demolition has begun of the former GHB Insurance office building and the Little Da Nang Restaurant, seen here, on the corner of 4th and Water Street in downtown Olympia. The building is adjacent to the popular Heritage Fountain. Photo taken December 5, 2015.

Draft City Parks Plan Deadline For Public Comment on Friday

By Janine Gates

The fences are up, the equipment is in place, and building demolition has begun on the southwest corner of 4th and Water Street in downtown Olympia across from Percival Landing. 

The buildings housed the former GHB Insurance business and Little Da Nang Restaurant. The city cleared vacant buildings on two acres of the west part of the isthmus in late November.

“The Heritage Fountain was envisioned to encompass the entire block, so the city acquired these two sites as they became available, Kip Summers, City of Olympia’s Parks, Arts and Recreation project manager told Little Hollywood on Wednesday.

The city purchased the GHB Insurance site in 1997, which was the same time it purchased the properties that are now Heritage Fountain. The city purchased the Little Da Nang restaurant site in 2007,” he said.

“The intent was to continue renting the buildings until major repairs were needed. That time has come and the buildings were in need of new roofs, heating systems, and other miscellaneous repairs. Therefore, we decided it best to remove the buildings, rather than invest money into structures that are ultimately slated for demolition,” said Summers.

Building demolition is expected to take two weeks.

The next development for the site is still in question. The site is part of the City’s Community Renewal Area (CRA) Water Street Redevelopment Request for Proposals. That request is on the city’s website at http://olympiawa.gov/city-government/rfp-and-rfq.aspx

For more information about the project, contact Kip Summers, City of Olympia, (360) 570-5834 or ksummers@ci.olympia.wa.us

Above: Demolition equipment appeared to be ready on Saturday to take down the vacant, nine story Mistake on the Lake, also known as the Capitol Center Building in downtown Olympia. Equipment was instead ready to demolish the buildings on the corner of 4th and Water Street. 

Park Plan Public Comment Deadline

The public comment deadline for the city’s 2016 draft Parks, Arts, and Recreation plan is Friday, Dec 11th at 5:00 p.m. The Plan is available at www.olympiawa.gov/parksplan.  

Public comments can be made in the following ways: e-mail comments to jturlove@ci.olympia.wa.us or olympiaparks@ci.olympia.wa.us or at www.olyspeaks.org.

The Parks, Arts and Recreation Plan provides a 20-year vision for parks, arts and recreation. The plan identifies the general location of future parks and open space, and includes a capital investment strategy. The draft 2016 Parks, Arts and Recreation Plan proposes acquisition of 417 acres of new park land, an increase of more than 25 percent to Olympia’s existing 16-mile trail inventory; elimination of the existing four million major maintenance backlog and more.


For more information about the Plan, contact Jonathon Turlove, Associate Planner, City of Olympia, at jturlove@ci.olympia.wa.us or (360) 753 - 8068.

Going…Going…Almost Gone: Demolition of Blight on the Isthmus


Above: Building demolition today in downtown Olympia across from Bayview Market opened up the view to the Capitol Building.
 
By Janine Unsoeld
At long last, building demolition at 505 Fourth Avenue in downtown Olympia across from Bayview Market has begun, facilitated by Seattle-Tacoma based contractor Dickson Company.

According to the City of Olympia, this work is expected to take no more than 10 days and no site improvements are planned or funded.  
In recent years, Olympia acquired two properties on the isthmus at 505 and 529 Fourth Avenue West. Demolition of the second building, the former Thurston County Health Department, will occur in early summer.

This project is a funding partnership of the City of Olympia, Thurston County, and the Olympia Capitol Park Foundation.
But What About The Mistake on the Lake?
The Olympia Capitol Park Foundation sent out a news release in late March detailing progress at and near the site, including the vacant nine story building, the Mistake on the Lake, also known as the Capitol Center Building, which is not currently scheduled for demolition: 

The City of Olympia asked the state Legislature for help in removing the long vacant Capitol Center building from the Isthmus. The proposed capital budget released this week by the House Capitol Budget Chair recommends an appropriation of $900,000 that may be used to help with acquisition and demolition of the building…. Representatives Sam Hunt, Chris Reykdal, and Senator Karen Fraser are working together in support of getting state support for funds in the capital budget,” said Jerry Reilly, Foundation chair.

“Although the exact costs of acquiring and removing the Capitol Center building cannot be precisely known until a purchase agreement can be reached with the current owner, best estimates are that the cost, including demolition, could be as high as $12 million….
“The Olympia Capitol Park Foundation has already pledged to raise $400,000 in private donations for development of the Capitol Olympic Vista Park. Both the city of Olympia and Thurston County have been outstanding partners in the progress made so far….

 “There are still a variety of opinions as to how to re-develop all of the land on the isthmus….The position of the Olympia Capitol Park Foundation is that the best use is as a publicly owned civic space, with structures, if any, no higher than 35 feet. But, above all, it is most essential to get ownership (site control) of all of the land as soon as possible. The owners of the Capitol Center building want to re-develop it as a hotel. If this happens, we may live with this building for another fifty years and miss the opportunity to perfect the unparalleled view from the Capitol campus to Puget Sound and the Olympic mountains beyond as envisioned by Capitol designers Wilder and White and the Olmsted brothers a century ago. Our immediate goal is to get the site “down and green” or “down and clean” and then have an open community process to decide what comes next.” 
The Olympia Capitol Park Foundation was established in 2008 as a 501(c) (3) non-profit corporation. Contributions to the Foundation are tax deductible charitable gifts under the federal Internal Revenue Code. Undesignated or general donations will be used for land acquisition, park development, and/or related expenses, such as operations or publicity. Donations for Land and Park Acquisition will be used to acquire some or all of the land and also for park development.

For more information, contact Jerry Reilly, Chair, Olympia Capitol Park Foundation, at vistapark@capitolvistapark.org or mail donations to Capitol Vista Park, PO Box 1964, Olympia, WA 98507.
For more information about the demolition from the City of Olympia, contact Brett Bures, Project Manager, at (360) 753-8290.


Above: Looking northwest from Simmons Street, on-site building demolition workers knocked off today about 4:00 p.m. 

 
 

West Olympia Neighborhood Gets A Facelift

 

Above: Two properties on Division Street were recently purchased by Olympia resident Alicia Elliott. The house at 110 Division was in poor condition and demolished today. The property will be the site of a future business. The property next door at 106 Division will be remodeled into another business.

By Janine Unsoeld
www.janineslittlehollywood.blogspot.com

An area near the corner of Harrison and Division continues its transformation into a friendly, walkable neighborhood center in west Olympia.
Olympia resident Alicia Elliott bought two residential properties on busy Division Street earlier this summer and continues her bold vision to transform the area into a neighborhood center that welcomes foot traffic and locally owned businesses.

Recently, Elliott bought the property on the corner of Division and Harrison that became West Central Park, and the former DeGarmo’s Pharmacy property located next door to the park. That property is scheduled to become a café in 2015.

The properties at 106 Division and 110 Division are just down the street from the park. The house at 110 Division was in poor condition and was demolished today.
Elliott watched as Matt Aynardi of Altis Construction, LLC used an excavator to bulldoze the house. Susan Fernbach, a neighborhood resident who lives just behind the property, also watched.

“The area was coming out of its blight by the time I arrived in the neighborhood,” said Fernbach, who has lived behind the property for a year.
The 1930s era house was a rental in poor condition for many years, Elliott said, although she managed to save the new vinyl windows. All the metal and salvageable wood was taken out prior to destruction.  

“The floor, the walls…everything was spongy….I would have restored it if I could,” said Elliott.  
“It’s pretty decrepit. It has a lot of structural problems…to rehabilitate it wouldn’t have been cost effective,” agreed Chris Ruef of Altis Construction, who supervised the demolition. Ruef said he’d have the house down today and all debris removed by Monday.

Elliott said she had to get many environmental permits related to clean air, asbestos, and lead before proceeding with the bulldozing.
Elliott plans to build a two story, 2,500 square foot business on the site and restore the house next door at 106 Division, possibly into a bakery. Plans are still in the design phase but Elliott says that the businesses will look residential from the street. Fifteen parking spaces will be created in the back and a large White Oak tree and three apple trees in the back of the property will be spared.

Above: The yellow house on 106 Division Street will be remodeled into a business. West Central Park can be seen at the intersection of Harrison and Division.

Tumwater Seeks Public Comment on Old Brewery Proposed Development

 
 
Above: The Old Brewery in Tumwater and the Deschutes River as seen today.

By Janine Unsoeld
www.janineslittlehollywood.blogspot.com

The City of Tumwater is in the process of preparing an environmental impact statement (EIS) for the proposed redevelopment of an area that includes the Old Brewhouse.

The city has determined this redevelopment is likely to have a significant adverse impact on the environment.
The site is bounded by Custer Way to the south, the Deschutes River to the west, Capitol Lake to the north and the railroad to the east.

All comments to the city are due no later than October 20, 2014 by 5:00 p.m.

Comments on alternatives, mitigation measures, probable significant adverse impacts, and licenses or other approvals that may be required may be directed to: Tim Smith, AICP, City of Tumwater Planning Manager, 555 Israel Road SW, Tumwater, WA 98501; tsmith@ci.tumwater.wa.us or (360) 754-4212. 

In comments, refer to case TUM-14-0741. Be clear and concise and if possible, identify possible solutions. For a full description of the plans and proposed alternatives, contact the City of Tumwater.


The city was recently awarded a planning grant from the Community Economic Revitalization Board (CERB) to review the potential for public/private partnerships as the site redevelops.  
“According to the grant, we have to be done by June 2015, but we’re targeting a deadline in spring, and hope to have an open house for the public to review the draft EIS by the early part of next year,” said Tim Smith, City of Tumwater planner, earlier this week.


Owner’s Old Brewery Vision
The Old Brewery site owner, George Heidgerken, proposes to make the site into a hotel, restaurants, office space, retail, and a craft brewing and distilling center. Heidgerken bought the 22 acre property about four years ago for $1.5 million. His property also includes land on the Tumwater Historical Park side of the river.

Heidgerken has suggested building a walkway bridge across the river into the park. Currently, the only access road down to the property is a gated, narrow one lane road off of Custer Way.

Similar examples of his vision include worldwide destinations, and, closer to home, Spokane’s Riverfront Park with its historic Flour Mill, an area that contains a host of shops, restaurants, sights and activities for tourists and locals alike.  
Old Brewery owner George Heidgerken will speak about his plans in a presentation on Thursday, October 16, 12:00 – 1:00 p.m. at The Schmidt House, 330 Schmidt Place, Tumwater.  Doors open at 11:30 p.m. The event is open to the public. 
Above: The warehouse portion of the brewery has been significantly renovated. The extraordinary space has two floors, totaling about 36,000 square feet.
City of Tumwater – A City Divided
As I-5 cuts through the City of Tumwater, so are the city’s roles and responsibilities divided.

While the city is the lead agency in charge of determining the significant impact a redevelopment of the area would have on the environment, it is also a full partner in working with the current owner to redevelop the site into a craft brewing and distilling center.

A formal letter of mutual public/private partnership was signed in May by eight local organizations and their leaders expressly mentioning this as the primary purpose for their partnership.
The letter is signed by Old Brewery owner George Heidgerken, as president of Falls Development, and leading representatives of the Thurston County Economic Development Council, the Olympia Tumwater Foundation, the Port of Olympia, Washington State University Extension, South Puget Sound Community College, the Washington State University School of Food Science and the City of Tumwater.

No tribal, county, or City of Olympia organizations or representatives are listed as partners.
Additionally, according to the October newsletter of the Old Brewhouse Foundation, the city issued a contract in mid-September with a team led by an architectural firm to do a feasibility study on the craft brewing and distilling center goal. Part of their goal is to consider how the main Old Brewery tower can be purchased from its current owner.

The team’s report is expected to be presented to the city in January 2015. The Foundation says it will be “…monitoring the progress of this study and continue to encourage incorporation of a museum, beer-making demonstration opportunities and public gathering spaces as part of the project.”

The mission of the Old Brewhouse Foundation,  an organization created in 2008, is to facilitate development of a plan for acquisition,  restoration and public utilization of the Old Brew house area.

State Environmental Review Process
The City of Tumwater was awarded a grant from the Washington State Department of Ecology to assist with conducting an environmental review of the former brewery area.

The planned action environmental impact statement allows a project-level environmental review under the State Environmental Policy Act (SEPA) to proceed in advance of project permit application(s) within the planning area.
It will describe a range of development alternatives, evaluate the potential impacts of these scenarios, and identify required mitigation measures to reduce or eliminate significant adverse impacts.

Following its completion and the city’s adoption of a planned action ordinance, a specific development proposal can move forward without further environmental review provided the proposed development is consistent with the EIS and within the range of impacts that have been addressed.
Above: Construction equipment and maintenance debris was seen around the Old Brewery building earlier this week. Multiple areas with black tubing were seen in place trying to divert the water. The hillside is where a multiple story proposed parking garage would be in Alternatives 2 and 3. Tumwater planner Tim Smith said artesian springs are in the hillside and a 1000 stall parking garage as proposed in Alternative 3 would be about five to nine stories.
According to Chris Carlson, permit manager for the City of Tumwater, the concrete moats around the building are original to the building, to contain and divert water into a cistern, or large storage tanks, located under the building. This water was used in the brewing process.
Brewery District Vision

Through the Brewery District planning and visioning projects that have been conducted to date, the community has articulated a desire to make the brewery district a vibrant mixed-use destination.  
According to the City of Tumwater website, redevelopment of the historic brewery site has numerous public benefits. These include recreational opportunities and an expanded and integrated trail network. 

It also states that renovation of the historic tower represents civic pride in the brewery site and a successful redevelopment process retaining the architectural and aesthetic elements of the buildings are valuable for the site as living history. 
Potential areas to be considered in the environmental impact study includes: earth (a geotechnical analysis will be prepared), water (wetlands and shorelines), plants and animals; environmental health (former site contamination and hazardous materials); land use; historic and cultural resources; transportation, circulation and parking; public utilities; public services; economy, and a community policy analysis.

Washington Administrative Code 197-11-444 lists elements of the environment that could be considered.



Upper Picture: City of Tumwater planner Tim Smith provided a tour of the Old Brewery to a group of interested citizens earlier this week. When asked, Smith said the Old Brewery property was created on fill and the current parking lot is in a 100 year floodplain. He distributed a 1920’s era picture of the property, above, for reference.
 Proposed Alternatives

According to the City of Tumwater website, three build out alternatives will be analyzed for potential impacts over a 20-year planning horizon:

Alternative 1: No Action. The EIS is required to evaluate impacts associated with a No Action Alternative. For the purpose of the No Action Alternative in the Tumwater Brewery Planned Action EIS, it is assumed that development would occur within the site consistent with existing zoning. Any such development or redevelopment that is proposed within site in conjunction with the No Action Alternative would undergo environmental review on a project-by-project basis. Such projects would be subject to site-specific mitigation and potential SEPA-based appeals, without coverage under the non-project, Planned Action EIS process. Total lot coverage by existing buildings likely to be redeveloped is approximately 67,000 square feet (SF) with approximately 262,000 gross square feet (GSF) of buildable space. Alternative 2: Mixed-Use Redevelopment utilizing 493,500 GSF of space.
Alternative 2is assumed to include redevelopment within existing buildings (262,000 GSF), a new parking structure (200,000 GSF) with approximately 625 stalls and rebuild two demolished structures (31,500 GSF). Prospective land uses would include: parking, office, retail, distillery, craft brewing, hotel, restaurant and a museum. Total lot coverage by buildings is approximately 140,000 SF. Improved vehicular access, pedestrian bridge over the Deschutes River, connecting trail system and boardwalk are also included in this alternative.

Alternative 3: Mixed-Use Redevelopment utilizing 763,500 GSF of space. Alternative 3 is assumed to include redevelopment within existing buildings (262,000 GSF), a new parking structure (320,000 GSF) with approximately 1,000 stalls, rebuild two demolished structures (31,500 GSF) and a new-build structure (150,000 GSF). Prospective land uses under Alternative 3 would be the same as those under Alternative 2, plus residential (apartments and condos). Total lot coverage by buildings is approximately 160,000 SF. Similar to Alternative 2, improved vehicular access, pedestrian bridge over the Deschutes River, connecting trail system and boardwalk are included in this alternative.

Above: The Old Brewery in Tumwater as seen on a tour earlier this week.
For more information about Tumwater's Brewery District Plan, go to the City of Tumwater's website at www.ci.tumwater.wa.us or see past articles at  www.janineslittlehollywood.blogspot.com and use the search button.
For more information about the Old Brewhouse Foundation, go to www.oldbrewhouse.org.

Great Blue Heron Rookery Saved From Development

 
 
Above: Volunteers Meghan Hopkins and her four year old daughter, Clare, clear ivy from land at the end of Dickinson Avenue NW, recently purchased by Alicia Elliott.

By Janine Unsoeld
www.janineslittlehollywood.blogspot.com

The Olympia Coalition for Ecosystems Preservation announced this weekend that a Great Blue Heron rookery on Olympia’s westside has been saved.
In an open letter to the community this weekend, Daniel Einstein, founder of the Coalition, said that Olympian Alicia Elliott bought the property, thus preventing it from being developed into townhomes.

The group formed after it was announced that the city had received an application for a short plat and townhome development. The developer, Glenn Wells, proposed the construction of three, two-unit townhomes,Wells Townhomes, and a six bay detached garage.

The letter from the Coalition states that Elliott was moved by the threat facing the rookery.
…That began a journey which has led Alicia to purchase the 1.84-acre parcel that holds most, but not all, of the nesting trees. She is now under contract to purchase the adjacent 2.73-acre parcel to the north. This provides a critical buffer for the herons as they return for the winter breeding season. At the same time, we are in positive negotiations with the developer, who has been very receptive to the unique habitat profile of his property….”

Alicia Elliott is also known for purchasing vacant property on the corner of Division and Harrison, and creating the space into a vibrant community area now called West Central Park. Most recently, Elliott also bought the property of the former DeGarmo’s Pharmacy next to the park. That space is scheduled to be converted into a café in the Spring of 2015.
Rookery's First Seasonal Work Party

At the Coalition's first seasonal work party held this afternoon at the rookery site located at the end of Dickinson Avenue NW, many volunteers came to thank Elliott and work to clear the site of ivy and other debris.
Einstein took time to briefly describe the property’s purchase and history of the area.

“The developer was in a reciprocal easement agreement with another property owner through this driveway to access utilities, sewer, electric, gas. Any future subdivision could buy into his utility. Buying this parcel takes that out of the picture because these properties will never be subdivided,” said Einstein.

“In 2009, the developer logged the property, going right through the heron's nesting trees, and created a 450 foot driveway. After it was logged, the blue heron population plummeted.”

Asked if he has found any dead herons, Einstein said yes.

“We did find dead chicks and eggshells. We can’t prove it was directly linked to the logging because herons are preyed upon by eagles, but part of that is, the clearing of the trees left the nests wide open for the eagles to get in. They are also very sensitive to noise and this was a huge disruption,” said Einstein.
Einstein said there are 14 nests on the property. “That means 28 adults, and each nest usually contains four eggs, so there are about 50 to 60 herons here at the height of breeding season.”

Einstein says their breeding season is in August and September.
“The herons are gone now to other places, but they’ll be coming back in January or February, so this is our window of opportunity to do work. We want to create a viable ecosystem, so there’s going to be some restoration.”

Einstein says the remains of a former homeless camp there have been cleared.
“The idea is to close this area off and create a habitat preserve. We’re going to have to create that because there isn’t one in city code. The herons need to be left alone so we can enjoy them down on the shoreline. We are also working to daylight Schneider Creek and restore it for fish passage….Eventually, we want to protect 80 to 90 acres,” said Einstein.

Above: Looking like Truffula trees, this tree has several visible blue heron nests.


While Einstein says he’s been having positive conversations with city officials, a few policies regarding codes and lax permitting have to be changed in order to make progress.
 

He also stressed the need to make the city’s urban forester position fulltime. City of Olympia Urban Forester Michelle Bentley has a heavy workload and is only available part-time, Monday through Friday, 8:00 a.m. – 12:00 noon.

Volunteers Make It Happen

“It’s so exciting!” said Debbie Hathaway, a board member of the Olympia Coalition for Ecosystems Preservation.
“It’s been a very encouraging sign that neighbors care about wildlife corridors. It’s a sign of good things to come. It’s also a good example of how we can work together,” said Hathaway.

Northwest neighborhood resident Meghan Hopkins also came, and brought her hard-working four year old daughter, Clare.
“We can see the herons from our living room window. It’s inspiring to see community members come together for what they believe in for the creatures of the natural and human worlds, and balance out everyone’s needs,” said Meghan Hopkins.

For more information about the Olympia Coalition for Ecosystems Preservation, go to: http://www.olyecosystems.org.
Back-To-Back Work Parties
Above: Seth Chance, Robyn Montgomery, and Alicia Elliott take a brief break from working while Ruben Males rakes the open space at West Central Park today. The park features edible and medicinal plants, which are scheduled to be labeled with small brass plaques.Today, workers harvested the last of the tomatoes, delicata squash, and strawberries of the season.



For more information about West Central Park, Alicia Elliott, and DeGarmo’s Pharmacy, go to www.janineslittlehollywood.blogspot.com and type key words into the search engine.

Labels